/
|
Moss Construction, alongside developer URBY, completed URBY Dallas Phase Two. Moss completed Phase One of the project in 2023. The combined cost of each project phase totals more than $215 million. URBY Dallas was designed by Amsterdam-based architect Concrete and local Dallas architect 5G Studio Collaborative.